Our Project Catalogue

PROJECT TITLE CLIENT DATE
Forcados -Yokri Pipeline Survey and Pipelay/Anchor Handling Positioning for Sea Constructor Lay barge FYNAG for SPDC – Forcados Yokri SPDC/MICHARRY/

CMES

March -Date On-Going
Geophysical and Debris Survey:  Idoho – Inanga – Ata-6 in Mobil Producing Nigeria Field Tenoil Petroleum and Energy Services Ltd March -April 2020

Completed

Debris Survey for IMA & Okoro Field AMNI April 2020
Geotechnical Investigation for HDD of River Niger (OBOB Pipeline Project) Enviro-Geophysics Ltd February -April 2020
Risers Installation of Dangote Refinery Pipelines – Lagos CMES April – June 2019
EIA Survey of OML 123 (CALL UP) ADDAX Sept. 2018 –Feb. 2019
Geophysical and Geotechnical Survey:  Idoho – Inanga in Mobil Producing Nigeria Field Tenoil Petroleum and Energy Services Ltd November – December 2018
Construction Survey and Cathodic Protection: (Construction of 12’ Bulk Crude line and 6’ Gas Lift Pipeline x 14km in OML 124) ADDAX/LATEEJAY April – July 2018
Geophysical Seabed/2D HR and Geotechnical OML 88 Movido Exploration and Production Ltd

In Partnership with Zenilum Company Limited

July –August 2018 (Completed)
Seabed Survey Of  The Critical Paths Along The Bonny River Tow Route, From Aveon Quayside To Open Sea (Egina Phase 2)

 

Saipem Contracting Nigeria Limited Field Work and Completed – 2018
LOT B: 193km x 36” Abuja Terminal – Kaduna Terminal Section  of the Ajaokuta-Kaduna-Kano Gas Pipeline) Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

NNPC

In Partnership with Sybag Energy Limited

Completed
Seabed and EIA Survey for NECONDE. Near Escravos Dukoria/Neconde May 2017
Seabed Survey Of  The Critical Paths Along The Bonny River Tow Route, From Aveon Quayside To Open Sea (Egina Phase 1) Saipem Contracting Nigeria Limited Oct. 2016
Seabed and Environment Survey for SK Endeavor Fire Location at Escravos Verde Environmental Limited – Ireland Dublin March – April 2016
Geotechnical Investigation Survey for the ATA-6 for placement of Jack up Rig – According to Matthew Daniel Specification (ExxonMobil Field) Tenoil Petroleum & Energy Services Limited  January – March 2016
Seabed/Geophysical Survey of ATA-6 Pipeline Route and Gravity coring samplings on selected points along the pipeline route Tenoil Petroleum & Energy Services Limited August – September 2015
29km Ubima – Obele FS Crude-Oil Pipeline Survey Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

ELAND September-October   2015
Piling Installation ATA Field CMES JANUARY 2015
TILL DATE
As-Laid (Multi-Beam Survey) Survey Installation of 12” Riser at the ADRP 1 Platform ADDAX/KAZTEC JULY , 2014
Post Lay (Multi-Beam Survey) Survey of 6” Gas Pipeline Between ADNB to ADNH-4 ADDAX/KAZTEC MAY, 2014

 

PROJECT TITLE CLIENT DATE
Post Lay (Multi-Beam Survey)  ADRP1 and Ebughu  Pipeline Installation of Booster Compression (BC) -2 ADDAX/KAZTEC Jun-14
Pre (Bathymetry Survey) and Post (Multi-Beam Survey) Survey Booster Compress (BC) -2 of Ebughu Pipeline Platform ADDAX/KAZTEC JUNE, 2014
Pre-Lay (Multi Beam Survey) Survey Installation of 12” Riser at the ADRP 1 Platform ADDAX/KAZTEC MAY – JUNE , 2014
Barge Positioning @ ADRP1 and Ebughu  Pipeline Installation of Booster Compression (BC) -2 ADDAX/KAZTEC May-14
Pre and Post Survey (Multi Beam Survey) Booster Compress (BC) -2 of Ebughu Pipeline Platform ADDAX/KAZTEC MAY, 2014
Geophysical (Bathymetry Survey) Survey of 6” Gas Pipeline Between ADNB to ADNH-4 ADDAX/KAZTEC MAY, 2014
Geophysical (Bathymetry Survey) Survey Pre And Post Installation Survey (12” Riser Repairs At ADRP1) ADDAX/KAZTEC March 2014 –May 2014
Navigation and Positioning Survey of LB Cameron

(ADNHB – EBPP)

ADDAX/KAZTEC Jan.2014 –Feb. 2014
Navigation and Positioning Survey of GSF Monitor Rig Transocean Dec.2013–Jan. 2014
Navigation and Positioning Survey of AD 10 Rig Transocean Oct. – Nov. 2013
Navigation and Positioning Survey of GSF Baltic 1 Rig Transocean Aug. – Sept. 2013

 

 

PROJECT TITLE CLIENT DATE
Mesotech (Bathymetry Survey) Surveys of 12”, 8” and 6”Pipeline@ ADRP ADDAX Sep-13
Ofon Phase 2 Project/Bonny River Survey SAIPEM Oct. 2013
Mesotech (Bathymetry Survey) Surveys of 2 x 4”Pipeline@ ADSW ADDAX Oct-13
Cheyenne Lay barge and here (3) Anchor Handling Tug-Boat. ADDAX/KAZTEC MARCH,2013
Provision of Surface Positioning on Jack-Up Barge on Whiskey Star XI OML 123 ADDAX/KAZTEC MARCH, 2013
Provision of Surface Positioning on Jack-Up Barge on Whiskey Star VII  OML 123 ADDAX/KAZTEC Jan-13
Provision of Surface Positioning on Jack-Up Barge on Whiskey Star XIII  OML 123 ADDAX/KAZTEC Jan-13
Pipeline Crossing and Repair Survey MV Aleutian ADDAX/KAZTEC Jan-13
Provision of Bathymetry and Debris Survey of Chevron EGP3 Project CMES NOV – DEC, 2012
Geotechnical Investigation Survey for the Phase – 1 of the KTA Alliance Prefabrication Yard, Snake Island ADDAX/KAZTEC SEPTEMBER – DECEMBER, 2012
Bathymetry and Debris Survey of The Snake Island Fabrication Yard of the ADDAX/KAZTEC ADDAX/KAZTEC JUNE- AUGUST, 2012

 

PROJECT TITLE CLIENT DATE
As-Laid (Multi-Beam Survey) Survey of Selected Pipelines (TB-1921 Project)

·         AD22 – ADNH6

·         AD22 – ADNH7

·         AD22 –ADSI

·         ADH4H – ADNB

·         TPU – KTM-B

·         EBUGBU PLATFORM

·         ORON WEST – SOUTH PLAFORM

·         ORON WEST – WHP PLATFORM

·         ADRPI -TMMP

ADDAX/KAZTEC OCTOBER 2011 -JULY, 2012
Ekulo Cheyenne Lay barge Anchor Handling Construction Survey of Selected Pipelines (TB-1921 Project)

·         AD22 – ADNH6

·         AD22 – ADNH7

·         AD22 –ADSI

·         ADH4H – ADNB

·         TPU – KTM-B

·         EBUGBU PLATFORM

·         ORON WEST – SOUTH PLAFORM

·         ORON WEST – WHP PLATFORM

·         ADRPI -TMMP

ADDAX/KAZTEC OCTOBER 2011 -JULY, 2012
Prelay ((Bathymetry and Multi-Beam Survey) Survey of Selected Pipelines (TB-1921 Project)

·         AD22 – ADNH6

·         AD22 – ADNH7

·         AD22 –ADSI

·         ADH4H – ADNB

·         TPU – KTM-B

·         EBUGBU PLATFORM

·         ORON WEST – SOUTH PLAFORM

·         ORON WEST – WHP PLATFORM

·         ADRPI -TMMP

ADDAX/ KAZTEC OCOBER 2010-JULY, 2012

 

PROJECT TITLE CLIENT DATE
Escravos offshore seabed survey for NAE ABO FIELD (ABO 1, ABO 2, ABO 3 and ABO 4) Using ARMADA TUAH Vessel NAOC/NAE JULY, 2012
Seabed Survey of Robertkiri Crude Barge Route Navigation Route CHEVRON Apr-12
Underwater Conductor Survey AFREN MAY, 2012
Seabed (Bathymetry and Multi-Beam Survey) Survey of Okan-Sonam Pipeline ROW CHEVRON FEB-MARCH 2012
Seabed (Bathymetry and Multi-Beam Survey) Survey of Okoro Field AFREN DEC. 2011
Seabed (Bathymetry and Multi-Beam Survey) Survey of EGP 3B 24’’ Pipeline ROW CHEVRON DEC, 2011
Rig move/Online Navigation of SK ENDEAVOR From (To Meji 4, From Meji 4 to Meji 2, Meji 2 to Okan JKT 14, Okan JKT 14 to Funiwa) CHEVRON Call –Off Contract
Bathymetry/Seabed Survey of Lagos Harbor (LADOL) Transocean August, 2011
Navigation/Positioning Of Fairstar Fjord Barge And Anchors For Load Out Of DIBI And OLERO Compression Barges At Escravos Rivers CHEVRON Call-Off Contract
Seabed/Bathymetry Survey of Okoro Field AFREN DEC. 2011
Seabed/Bathymetry Survey of EGP 3B 24’’ Pipeline ROW CHEVRON DEC, 2011
Rig move/Online Navigation of SK ENDEAVOR From (To Meji 4, From Meji 4 to Meji 2, Meji 2 to Okan JKT 14, Okan JKT 14 to Funiwa) CHEVRON Call –Off Contract
PROJECT TITLE CLIENT DATE
Bathymetry/ Seabed Survey of Lagos Harbor (LADOL) Transocean August, 2011
Navigation/Positioning Of Fairstar Fjord Barge And Anchors For Load Out Of DIBI And OLERO Compression Barges At Escravos Rivers CHEVRON Call-Off Contract
ADSW RF Pipe Locator For Seawolf Onome Rig ADDAX ADDAX Call-off Contract
ADNH-4H and AND-B Seabed Survey (OML 123 ADDAX FIELD) ADDAX/KAZTEC Call-off Contract
Installation of Topside and Subsea Pipelines in OML 123 (Anchor Handling and Underwater Survey Project) ADDAX/KAZTEC Call Off Contract
Delimitation Survey for NAOC’s Land and Swamp Spillage/Pollution Sites NAOC From April 2010 till date
Provision of Marine Seabed Survey Service CHEVRON Call off Contract
Provision of Marine Seabed Survey Service CHEVRON Call off Contract
Provision of Navigation Service for Crude Barge/Tug from Escravos- Robertkiri-Escravos CHEVRON Call off Contract

 

PROJECT TITLE CLIENT DATE
83km x 18”OB/OB – INDORAMA Gas Pipeline Survey Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

ZAKHEM June –October   2013

 

Geotechnical Investigation Survey for the Phase – 1 of the KTA Alliance Prefabrication Yard, Snake Island ADDAX/KAZTEC SEPTEMBER – DECEMBER, 2012
Boundary Survey of The Ilashe Community, Snake Island, Lagos State ADDAX/KAZTEC OCTOBER, 2012
Topographical, Detailing and Perimeter Survey of The Snake Island Fabrication Yard of the ADDAX/KAZTEC ADDAX/KAZTEC JULY- OCTOBER, 2012
Bathymetry and Debris Survey of The Snake Island Fabrication Yard of the ADDAX/KAZTEC ADDAX/KAZTEC JUNE- AUGUST, 2012
126km x 24” Oben Node – Obiafu/Obrikom Station Pipeline Route Verification Survey. (National Integrated Power Project)(Pipeline Route Survey) NNPC/ Petro-Geo Limited JANUARY     2010

Completed

Delimitation Survey for Nigerian Agip Oil Company for Land and Swamp Nigerian Agip Oil Company Limited 2010 – 2014
29 km Ovade-Ogharafe Via Amukpe Manifold Pipeline and Proposed Tankfarm Project

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

PAN-OCEAN/

DIGITAL HORIZON

April 2010

Completed

EPC of Temporary & Permanent Cathodic Protection Systems  Installation For 24” x 56km Escravos-Warri Pipeline Project (Pipeline-Gas Supply to Warri  NGC Station) NGC/ZAKHEM 100% Completion
620km x 48” (2 Lines) Ajaokuta-Abuja-Kano (AKK) Gas Pipeline Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

ATLAS International Engineering Services Dec 2009 – May 2010
105km x 24” Adanga Calabar Gas Supply Pipeline Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

KAZTEC/NDPH

 

PROJECT TITLE CLIENT DATE
Cotonou Lagoon 8” Gas Supply Pipeline for West Africa Gas Pipeline Project

Ø  Geotechnical  Investigation Survey

Ø  Hydrographic Survey

Ø  Environmental Survey

ZAKHEM/WAGPP) (Completed Project) Sep 2008
Repair and Casing Touching Escravos-Lagos Gas Pipeline;

–       Oben Crossing (KP 25 + 760)

–       Benin-Agbor Crossing (KP 79 + 372)

–       Oluku – Owo Crossing (99 + 911)

–       Old Ore Road Crossing (185 + 896)

–       Lagos – Benin Crossing (240 + 571)

–       Iwopin Crossing (254 + 157)

–       Epe – Ikorodu Crossing (331 + 960)

ARCO/NGC April 2007
31km x 24’’ Itoki  – Papalanto Gas Supply Pipeline Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

PHELPS/TABA Sep 2006 – Dec. 2006
24km x 18’’ Owasa – Alaoji Gas Supply Pipeline Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

Zakhem Const. Nigeria Limited/ Dover Engineering Sep 2006 – Dec. 2006
196km x 36’’ Oben-Ajaokuta Gas Supply Pipeline Project To PHCN Geregu

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

Zakhem Const. Nigeria Limited/ Dover Engineering Sep 2006 – Dec. 2006
4.5km x 24’’ Geregu Gas Supply Pipeline Project

Ø  Pipeline Route Survey,

Ø  Soil Resistivity Survey

Ø  Geotechnical  Investigation Survey

Zakhem Cons. Nigeria Limited/ Dover Engineering Sep 2006 – Dec. 2006