PROJECT TITLE | CLIENT | DATE |
Forcados -Yokri Pipeline Survey and Pipelay/Anchor Handling Positioning for Sea Constructor Lay barge FYNAG for SPDC – Forcados Yokri | SPDC/MICHARRY/
CMES |
March -Date On-Going |
Geophysical and Debris Survey: Idoho – Inanga – Ata-6 in Mobil Producing Nigeria Field | Tenoil Petroleum and Energy Services Ltd | March -April 2020
Completed |
Debris Survey for IMA & Okoro Field | AMNI | April 2020 |
Geotechnical Investigation for HDD of River Niger (OBOB Pipeline Project) | Enviro-Geophysics Ltd | February -April 2020 |
Risers Installation of Dangote Refinery Pipelines – Lagos | CMES | April – June 2019 |
EIA Survey of OML 123 (CALL UP) | ADDAX | Sept. 2018 –Feb. 2019 |
Geophysical and Geotechnical Survey: Idoho – Inanga in Mobil Producing Nigeria Field | Tenoil Petroleum and Energy Services Ltd | November – December 2018 |
Construction Survey and Cathodic Protection: (Construction of 12’ Bulk Crude line and 6’ Gas Lift Pipeline x 14km in OML 124) | ADDAX/LATEEJAY | April – July 2018 |
Geophysical Seabed/2D HR and Geotechnical OML 88 | Movido Exploration and Production Ltd
In Partnership with Zenilum Company Limited |
July –August 2018 (Completed) |
Seabed Survey Of The Critical Paths Along The Bonny River Tow Route, From Aveon Quayside To Open Sea (Egina Phase 2)
|
Saipem Contracting Nigeria Limited | Field Work and Completed – 2018 |
LOT B: 193km x 36” Abuja Terminal – Kaduna Terminal Section of the Ajaokuta-Kaduna-Kano Gas Pipeline) Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
NNPC
In Partnership with Sybag Energy Limited |
Completed |
Seabed and EIA Survey for NECONDE. Near Escravos | Dukoria/Neconde | May 2017 |
Seabed Survey Of The Critical Paths Along The Bonny River Tow Route, From Aveon Quayside To Open Sea (Egina Phase 1) | Saipem Contracting Nigeria Limited | Oct. 2016 |
Seabed and Environment Survey for SK Endeavor Fire Location at Escravos | Verde Environmental Limited – Ireland Dublin | March – April 2016 |
Geotechnical Investigation Survey for the ATA-6 for placement of Jack up Rig – According to Matthew Daniel Specification (ExxonMobil Field) | Tenoil Petroleum & Energy Services Limited | January – March 2016 |
Seabed/Geophysical Survey of ATA-6 Pipeline Route and Gravity coring samplings on selected points along the pipeline route | Tenoil Petroleum & Energy Services Limited | August – September 2015 |
29km Ubima – Obele FS Crude-Oil Pipeline Survey Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
ELAND | September-October 2015 |
Piling Installation ATA Field | CMES | JANUARY 2015 |
TILL DATE | ||
As-Laid (Multi-Beam Survey) Survey Installation of 12” Riser at the ADRP 1 Platform | ADDAX/KAZTEC | JULY , 2014 |
Post Lay (Multi-Beam Survey) Survey of 6” Gas Pipeline Between ADNB to ADNH-4 | ADDAX/KAZTEC | MAY, 2014 |
PROJECT TITLE | CLIENT | DATE |
Post Lay (Multi-Beam Survey) ADRP1 and Ebughu Pipeline Installation of Booster Compression (BC) -2 | ADDAX/KAZTEC | Jun-14 |
Pre (Bathymetry Survey) and Post (Multi-Beam Survey) Survey Booster Compress (BC) -2 of Ebughu Pipeline Platform | ADDAX/KAZTEC | JUNE, 2014 |
Pre-Lay (Multi Beam Survey) Survey Installation of 12” Riser at the ADRP 1 Platform | ADDAX/KAZTEC | MAY – JUNE , 2014 |
Barge Positioning @ ADRP1 and Ebughu Pipeline Installation of Booster Compression (BC) -2 | ADDAX/KAZTEC | May-14 |
Pre and Post Survey (Multi Beam Survey) Booster Compress (BC) -2 of Ebughu Pipeline Platform | ADDAX/KAZTEC | MAY, 2014 |
Geophysical (Bathymetry Survey) Survey of 6” Gas Pipeline Between ADNB to ADNH-4 | ADDAX/KAZTEC | MAY, 2014 |
Geophysical (Bathymetry Survey) Survey Pre And Post Installation Survey (12” Riser Repairs At ADRP1) | ADDAX/KAZTEC | March 2014 –May 2014 |
Navigation and Positioning Survey of LB Cameron
(ADNHB – EBPP) |
ADDAX/KAZTEC | Jan.2014 –Feb. 2014 |
Navigation and Positioning Survey of GSF Monitor Rig | Transocean | Dec.2013–Jan. 2014 |
Navigation and Positioning Survey of AD 10 Rig | Transocean | Oct. – Nov. 2013 |
Navigation and Positioning Survey of GSF Baltic 1 Rig | Transocean | Aug. – Sept. 2013 |
PROJECT TITLE | CLIENT | DATE |
Mesotech (Bathymetry Survey) Surveys of 12”, 8” and 6”Pipeline@ ADRP | ADDAX | Sep-13 |
Ofon Phase 2 Project/Bonny River Survey | SAIPEM | Oct. 2013 |
Mesotech (Bathymetry Survey) Surveys of 2 x 4”Pipeline@ ADSW | ADDAX | Oct-13 |
Cheyenne Lay barge and here (3) Anchor Handling Tug-Boat. | ADDAX/KAZTEC | MARCH,2013 |
Provision of Surface Positioning on Jack-Up Barge on Whiskey Star XI OML 123 | ADDAX/KAZTEC | MARCH, 2013 |
Provision of Surface Positioning on Jack-Up Barge on Whiskey Star VII OML 123 | ADDAX/KAZTEC | Jan-13 |
Provision of Surface Positioning on Jack-Up Barge on Whiskey Star XIII OML 123 | ADDAX/KAZTEC | Jan-13 |
Pipeline Crossing and Repair Survey MV Aleutian | ADDAX/KAZTEC | Jan-13 |
Provision of Bathymetry and Debris Survey of Chevron EGP3 Project | CMES | NOV – DEC, 2012 |
Geotechnical Investigation Survey for the Phase – 1 of the KTA Alliance Prefabrication Yard, Snake Island | ADDAX/KAZTEC | SEPTEMBER – DECEMBER, 2012 |
Bathymetry and Debris Survey of The Snake Island Fabrication Yard of the ADDAX/KAZTEC | ADDAX/KAZTEC | JUNE- AUGUST, 2012 |
PROJECT TITLE | CLIENT | DATE |
As-Laid (Multi-Beam Survey) Survey of Selected Pipelines (TB-1921 Project)
· AD22 – ADNH6 · AD22 – ADNH7 · AD22 –ADSI · ADH4H – ADNB · TPU – KTM-B · EBUGBU PLATFORM · ORON WEST – SOUTH PLAFORM · ORON WEST – WHP PLATFORM · ADRPI -TMMP |
ADDAX/KAZTEC | OCTOBER 2011 -JULY, 2012 |
Ekulo Cheyenne Lay barge Anchor Handling Construction Survey of Selected Pipelines (TB-1921 Project)
· AD22 – ADNH6 · AD22 – ADNH7 · AD22 –ADSI · ADH4H – ADNB · TPU – KTM-B · EBUGBU PLATFORM · ORON WEST – SOUTH PLAFORM · ORON WEST – WHP PLATFORM · ADRPI -TMMP |
ADDAX/KAZTEC | OCTOBER 2011 -JULY, 2012 |
Prelay ((Bathymetry and Multi-Beam Survey) Survey of Selected Pipelines (TB-1921 Project)
· AD22 – ADNH6 · AD22 – ADNH7 · AD22 –ADSI · ADH4H – ADNB · TPU – KTM-B · EBUGBU PLATFORM · ORON WEST – SOUTH PLAFORM · ORON WEST – WHP PLATFORM · ADRPI -TMMP |
ADDAX/ KAZTEC | OCOBER 2010-JULY, 2012 |
PROJECT TITLE | CLIENT | DATE | |
Escravos offshore seabed survey for NAE ABO FIELD (ABO 1, ABO 2, ABO 3 and ABO 4) Using ARMADA TUAH Vessel | NAOC/NAE | JULY, 2012 | |
Seabed Survey of Robertkiri Crude Barge Route Navigation Route | CHEVRON | Apr-12 | |
Underwater Conductor Survey | AFREN | MAY, 2012 | |
Seabed (Bathymetry and Multi-Beam Survey) Survey of Okan-Sonam Pipeline ROW | CHEVRON | FEB-MARCH 2012 | |
Seabed (Bathymetry and Multi-Beam Survey) Survey of Okoro Field | AFREN | DEC. 2011 | |
Seabed (Bathymetry and Multi-Beam Survey) Survey of EGP 3B 24’’ Pipeline ROW | CHEVRON | DEC, 2011 | |
Rig move/Online Navigation of SK ENDEAVOR From (To Meji 4, From Meji 4 to Meji 2, Meji 2 to Okan JKT 14, Okan JKT 14 to Funiwa) | CHEVRON | Call –Off Contract | |
Bathymetry/Seabed Survey of Lagos Harbor (LADOL) | Transocean | August, 2011 | |
Navigation/Positioning Of Fairstar Fjord Barge And Anchors For Load Out Of DIBI And OLERO Compression Barges At Escravos Rivers | CHEVRON | Call-Off Contract | |
Seabed/Bathymetry Survey of Okoro Field | AFREN | DEC. 2011 | |
Seabed/Bathymetry Survey of EGP 3B 24’’ Pipeline ROW | CHEVRON | DEC, 2011 | |
Rig move/Online Navigation of SK ENDEAVOR From (To Meji 4, From Meji 4 to Meji 2, Meji 2 to Okan JKT 14, Okan JKT 14 to Funiwa) | CHEVRON | Call –Off Contract | |
PROJECT TITLE | CLIENT | DATE | |
Bathymetry/ Seabed Survey of Lagos Harbor (LADOL) | Transocean | August, 2011 | |
Navigation/Positioning Of Fairstar Fjord Barge And Anchors For Load Out Of DIBI And OLERO Compression Barges At Escravos Rivers | CHEVRON | Call-Off Contract | |
ADSW RF Pipe Locator For Seawolf Onome Rig ADDAX | ADDAX | Call-off Contract | |
ADNH-4H and AND-B Seabed Survey (OML 123 ADDAX FIELD) | ADDAX/KAZTEC | Call-off Contract | |
Installation of Topside and Subsea Pipelines in OML 123 (Anchor Handling and Underwater Survey Project) | ADDAX/KAZTEC | Call Off Contract | |
Delimitation Survey for NAOC’s Land and Swamp Spillage/Pollution Sites | NAOC | From April 2010 till date | |
Provision of Marine Seabed Survey Service | CHEVRON | Call off Contract | |
Provision of Marine Seabed Survey Service | CHEVRON | Call off Contract | |
Provision of Navigation Service for Crude Barge/Tug from Escravos- Robertkiri-Escravos | CHEVRON | Call off Contract |
PROJECT TITLE | CLIENT | DATE |
83km x 18”OB/OB – INDORAMA Gas Pipeline Survey Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
ZAKHEM | June –October 2013
|
Geotechnical Investigation Survey for the Phase – 1 of the KTA Alliance Prefabrication Yard, Snake Island | ADDAX/KAZTEC | SEPTEMBER – DECEMBER, 2012 |
Boundary Survey of The Ilashe Community, Snake Island, Lagos State | ADDAX/KAZTEC | OCTOBER, 2012 |
Topographical, Detailing and Perimeter Survey of The Snake Island Fabrication Yard of the ADDAX/KAZTEC | ADDAX/KAZTEC | JULY- OCTOBER, 2012 |
Bathymetry and Debris Survey of The Snake Island Fabrication Yard of the ADDAX/KAZTEC | ADDAX/KAZTEC | JUNE- AUGUST, 2012 |
126km x 24” Oben Node – Obiafu/Obrikom Station Pipeline Route Verification Survey. (National Integrated Power Project)(Pipeline Route Survey) | NNPC/ Petro-Geo Limited | JANUARY 2010
Completed |
Delimitation Survey for Nigerian Agip Oil Company for Land and Swamp | Nigerian Agip Oil Company Limited | 2010 – 2014 |
29 km Ovade-Ogharafe Via Amukpe Manifold Pipeline and Proposed Tankfarm Project
Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
PAN-OCEAN/
DIGITAL HORIZON |
April 2010
Completed |
EPC of Temporary & Permanent Cathodic Protection Systems Installation For 24” x 56km Escravos-Warri Pipeline Project (Pipeline-Gas Supply to Warri NGC Station) | NGC/ZAKHEM | 100% Completion |
620km x 48” (2 Lines) Ajaokuta-Abuja-Kano (AKK) Gas Pipeline Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
ATLAS International Engineering Services | Dec 2009 – May 2010 |
105km x 24” Adanga Calabar Gas Supply Pipeline Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
KAZTEC/NDPH |
PROJECT TITLE | CLIENT | DATE |
Cotonou Lagoon 8” Gas Supply Pipeline for West Africa Gas Pipeline Project
Ø Geotechnical Investigation Survey Ø Hydrographic Survey Ø Environmental Survey |
ZAKHEM/WAGPP) (Completed Project) | Sep 2008 |
Repair and Casing Touching Escravos-Lagos Gas Pipeline;
– Oben Crossing (KP 25 + 760) – Benin-Agbor Crossing (KP 79 + 372) – Oluku – Owo Crossing (99 + 911) – Old Ore Road Crossing (185 + 896) – Lagos – Benin Crossing (240 + 571) – Iwopin Crossing (254 + 157) – Epe – Ikorodu Crossing (331 + 960) |
ARCO/NGC | April 2007 |
31km x 24’’ Itoki – Papalanto Gas Supply Pipeline Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
PHELPS/TABA | Sep 2006 – Dec. 2006 |
24km x 18’’ Owasa – Alaoji Gas Supply Pipeline Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
Zakhem Const. Nigeria Limited/ Dover Engineering | Sep 2006 – Dec. 2006 |
196km x 36’’ Oben-Ajaokuta Gas Supply Pipeline Project To PHCN Geregu
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
Zakhem Const. Nigeria Limited/ Dover Engineering | Sep 2006 – Dec. 2006 |
4.5km x 24’’ Geregu Gas Supply Pipeline Project
Ø Pipeline Route Survey, Ø Soil Resistivity Survey Ø Geotechnical Investigation Survey |
Zakhem Cons. Nigeria Limited/ Dover Engineering | Sep 2006 – Dec. 2006 |